Sacramento International Airport Terminal B

The new Terminal B project at the Sacramento International Airport consisted of a four story, 433,000 square foot terminal building connected by two pedestrian bridges to a new parking lot and an existing parking garage. Elevated roadways looped around the new terminal were built for vehicle circulation to both the departure and arrival gates. BMC performed the installation of Sanitary Waste and Vent, Storm and Domestic Cold Water plumbing systems throughout the central utility plant and administration building. In addition, BMC provided work on the elevated roadway and canopy drainage systems. Sacramento International Airport’s Terminal B achieved LEED® Silver Certification from the U.S. Green Building Council in May of 2012.